- Construction of 204 Bedroom Conference Hotel for NCDMB in Yenagoa, Bayelsa State.
- Provision of Engineering Services to IGPES Gas and Power for the Construction and Commissioning of jackets and Topside Contract (IKIKE Project) for Total E & P Nigeria Limited.
- Provision of Integrated CCTV System at Desiderata Building For the Joint Venture of Saipem Contracting Nigeria Limited & Daewoo Engineering Construction Nigeria Limited.
- Full Front-End Engineering Design Review and Detailed Engineering Design for the entire modularized Oil and Gas Processing facilities in OML 65.
- The scope of work includes the provision and mobilization of personnel (including technical specialists, employees and labor), fully skilled, competent and experienced in various engineering fields to support the Design engineering works for Train 7 Project.
- Provision of Access Control/Card Reader System for NLNG Train 7 Project Office at Desiderata Building For the Joint Venture of Saipem Contracting Nigeria Limited & Daewoo Engineering Construction Nigeria Limited.
- Provision of Engineering Manpower Services for Dangote Refinery.
– Provision of Engineering Manpower for Front-End Engineering Design for PREOWEI.
- Provision of Integrated CCTV System at Desiderata Building For the Joint Venture of Saipem Contracting Nigeria Limited & Daewoo Engineering Construction Nigeria Limited.
- Provision of Partitioning and Furniture for NLNG T7 Project at Desiderata Building for the Joint Venture of Saipem Contracting Nigeria Limited & Daewoo Engineering Construction Nigeria Limited.
- Installation Of Power for Bain Marie, Training 7 Project for the Joint Venture of Saipem Contracting Nigeria Limited & Daewoo Engineering Construction Nigeria Limited.
- Full Front-End Engineering Design for developing 5 gas wells to target 2 reservoirs (U8 & V2), Construction and installation of facilities for Gas processing, compression and export via a new gas pipeline to the existing Offshore Gas Gathering System (OGGS) Pipeline. Produced stabilized condensate is to be spiked into the Gas pipeline (i.e. OGGS). Produced water from the gas processing will be disposed overboard after being de-oiled to a level below 25ppmv. Provision shall be made for total plant recycle from downstream of the dehydration unit to the inlet of the depletion compressors to ensure the facility can run on very low gas rates for long periods.